Climbing wall Aztec for liceum "Technopolis"
Koltsovo, Novosibirsk region
In 2020, Aztec participated in the construction of the modern IT Lyceum Technopolis. The new Lyceum is one of the largest in the region, it is designed for 1050 students. Aztec had 2 tasks:
  • Build a modern climbing wall on difficulty with a unique design.
  • Provide the climbing wall with the necessary safety requirements.
Within 5 days, the Aztec team provided the project of the future climbing wall and started production. The production of the climbing wall parts and installation took 20 days.
The surface of the climbing wall panels is covered wi...
In 2020, Aztec participated in the construction of the modern IT Lyceum Technopolis. The new Lyceum is one of the largest in the region, it is designed for 1050 students. Aztec had 2 tasks:
  • Build a modern climbing wall on difficulty with a unique design.
  • Provide the climbing wall with the necessary safety requirements.
Within 5 days, the Aztec team provided the project of the future climbing wall and started production. The production of the climbing wall parts and installation took 20 days.
The surface of the climbing wall panels is covered with a friction coating that simulates friction on natural terrain. The outer corners are protected by metal pads to prevent the rope from rubbing against the corners of the climbing wall.
The climbing wall in Koltsovo is equipped with 7 points of upper insurance, allowing 7 athletes to train at the same time. The area in front of the climbing walls is equipped with mats of its own production for safe landing.
Our preppers equipped the climbing wall with hooks and reliefs of their own production, creating more than 20 climbing trails.
Show All
Year of construction - 2020
Implementation period - 25 дней days
In 2020, Aztec participated in the construction of the modern IT Lyceum Technopolis. The new Lyceum is one of the largest in the region, it is designed for 1050 students. Aztec had 2 tasks:
  • Build a modern climbing wall on difficulty with a unique design.
  • Provide the climbing wall with the necessary safety requirements.
Within 5 days, the Aztec team provided the project of the future climbing wall and started production. The production of the climbing wall parts and installation took 20 days.
The surface of the climbing wall panels is covered wi...
In 2020, Aztec participated in the construction of the modern IT Lyceum Technopolis. The new Lyceum is one of the largest in the region, it is designed for 1050 students. Aztec had 2 tasks:
  • Build a modern climbing wall on difficulty with a unique design.
  • Provide the climbing wall with the necessary safety requirements.
Within 5 days, the Aztec team provided the project of the future climbing wall and started production. The production of the climbing wall parts and installation took 20 days.
The surface of the climbing wall panels is covered with a friction coating that simulates friction on natural terrain. The outer corners are protected by metal pads to prevent the rope from rubbing against the corners of the climbing wall.
The climbing wall in Koltsovo is equipped with 7 points of upper insurance, allowing 7 athletes to train at the same time. The area in front of the climbing walls is equipped with mats of its own production for safe landing.
Our preppers equipped the climbing wall with hooks and reliefs of their own production, creating more than 20 climbing trails.
Show All
Year of construction - 2020
Implementation period - 25 дней days
CHARACTERISTICS OF THE CLIMBING WALL
Area, m² 75
Height, m. 6,7
Climbing wall for school, kindergarten
NEED CLIMBING CLIMBING?
We will tell you in detail about our conditions, types of work and
standard projects, we will calculate the cost and prepare an individual offer!
Pressing this button, I am giving my consent on 
processing of a personal data.